make an appointment with your tile Setter/Installer

From 1989, I have worked tirelessly has a Marble Tile Installer/setter to earn this reputation for quality and dependability on all the Amazing Floors porcelain tile setting and marble tile installations done as a ceramic tile setter. Amazing Floors Marble Tile installers, granite tile & Natural stone veneer contractor. Tile setters near me.

Porcelain tile, Natural Stone Veneer, marble tile stone, 
ceramic tile & Granite tile
 installation contractors for walls and Heated floor tile. tile setters near me

lets get crafty with your Marble tile contractor/Tile installer/tile setter.

Read how we created a curb-less heated shower floor with linear drain bathroom with big tiles

Designing a Curb-less Heated Shower Floor with linear drain: Our Journey with Joey and Jacqueline

Curb-less shower in East Abbotsford by your tile contractor
Big tiles curb-less heated shower floor bathroom
Wall tile complete


Nestled in the picturesque East Abbotsford, BC, where stunning landscapes meet modern living, we embarked on a transformative Large format porcelain tile shower floor with linear drain bathroom project that would forever change the home of Joey and Jacqueline. The adventure began before the arrival of their beloved little one, Jaxson. It started with an inspiring meeting with Joey and Jacqueline, a dynamic design duo known for their eye for detail.

The Initial Meeting

It was a summer day when we first met with Joey and Jacqueline. With shared passion for innovative design, we began to dream about their ideal bathroom space. We envisioned a seamless, curb-less heated shower with linear drain that not only looked beautiful but also offered a spa-like experience. The inclusion of a standing tub further added to our vision, creating a luxurious focal point in the room.

As we discussed our ideas, Joey emphasized the importance of planning the drain style and location early on. After brainstorming various options, we settled on a linear drain that would efficiently handle water flow while keeping the sleek lines we desired.

Planning the Design

Next came the exciting challenge of designing the slope for the heated shower floor. with linear drain.  We wanted the transition to be as smooth as possible, and Joey suggested a glass partition to define the shower area without closing it off. This would not only enhance the feeling of space but also let natural light flood the area, making it feel airy and inviting.

To ensure that our heated floor was both efficient and comfortable, we planned the installation of electric cables. Andre walked through the process, explaining how to strategically position the heating elements to provide even warmth throughout the floor, especially in the colder months.

Choosing the Right Tiles

One of the most crucial decisions was selecting the perfect tiles for their shower floor with linear drain. We wanted something that not only complemented our design but also had a high grip rating when wet. After exploring various options, we finally settled on large format tiles that combined aesthetic appeal with functionality. Their minimal grout lines would make cleaning easier, and their slip-resistant surface would provide safety for our family.

Bringing Our Vision to Life

As the installation began, it was thrilling to see our ideas come to fruition. The combination of the heated floor, large tiles, and glass partition began to shape our dream large format shower floor with linear drain bathroom. We couldn’t help but imagine the moments we would share in this space as a family, especially with Jaxson’s arrival just around the corner.

In the following blog, we’ll dive deeper into each phase of the project, sharing tips, challenges, and triumphs along the way. From choosing the right fixtures to the finishing touches, we’re excited to take you on this journey with us as we create a bathroom oasis that perfectly suits their family’s needs.

Read more details on our curb-less heated shower floor project in beautiful East Abbotsford!


Don't forget to bring the tub in if it won't fit in the door

Bring the tub in if it doesn't fit thru the door

First Step:

Open the floor for the drain location of this big tiles curb-less heated shower floor bathroom with linear drain and open tub

Opened floor to access drain pipes for this big tiles curb-less heated shower floor

Opening the Floor: Relocating the Drain Pipe for Our Linear Shower Drain


When it comes to transforming a bathroom, especially when installing a curb-less shower with linear drain, precise planning and execution are crucial. As we delved deeper into our project in beautiful East Abbotsford, it became clear that relocating the drain pipe was essential to making our vision a reality. Here’s a behind-the-scenes look at how we opened up the floor to access and reposition the drain pipe for our linear drain installation.

The Planning Phase

Before we even picked up a tool, we spent considerable time with Joey and Jacqueline mapping out our bathroom design. The linear drain we chose would not only enhance the aesthetics of our curb-less shower but also provide optimal drainage. However, to make it work, we had to ensure that the drain pipe was relocated to the ideal spot.

Andre emphasized the importance of having a well-thought-out plan to avoid any potential headaches down the line. With the dimensions and placement of the standing tub and shower clearly outlined, we felt confident moving forward.

The Big Step: Opening the Floor

With our plan in place, it was time for the somewhat daunting task of opening the floor. Here’s how we tackled it:

1. Gathering Tools and Materials

Before starting, we gathered all necessary tools: a reciprocating saw, pry bar, measuring tape, and safety gear including goggles and gloves. It was important to be prepared and work safely to avoid any mishaps.

2. Locating the Drain Pipe After measuring and marking the area where the new linear drain would be located, we carefully located the existing drain pipe. This was done by checking the layout of the plumbing, which had been discussed in our initial meetings with Joey.

3. Cutting the Floor Once we had confirmed the location, we used the reciprocating saw to cut through the floorboards. It was crucial to cut carefully and methodically to avoid damaging any nearby plumbing or electrical wires. As we sawed, there was a mix of excitement and apprehension—the moment of truth!

4. Removing Floorboards

With the floor cut, we gently pried up the boards, revealing the hidden plumbing beneath. This was an eye-opening experience, as we could finally see the inner workings of our bathroom. It felt like we were uncovering a piece of our home’s history.

5. Relocating the Drain Pipe Once we had access to the existing drain pipe, it was time to carefully disconnect it from its current position. With Joey’s guidance, we rerouted the pipe to the desired location for the linear drain. This step required precise measurements to ensure everything aligned perfectly.

Rebuilding the Floor

After relocating the drain pipe, we were ready to rebuild the floor. This involved sealing the connections and reinforcing the structure where we had made the cuts.

1. Reinforcing and Sealing

We made sure all connections were secure and watertight to prevent any future leaks. This was a crucial step that would ensure the longevity of our shower installation.

Reflecting on the Experience Looking back, opening the floor and relocating the drain pipe was a pivotal moment in our bathroom renovation journey. It required teamwork, patience, and a bit of courage, but with the expertise of Joey, we felt confident every step of the way.

As we move closer to completing our beautiful curb-less shower, we’re excited to see how each piece of the puzzle fits together. Stay tuned for more updates as we continue to share our journey in creating a serene and functional bathroom space in East Abbotsford!

Recess the shower floor with linear drain area by adding 2x4 framing to recessed the plywood flush with the studs

framing the surround of the studs to recess the plywood flush height of the studs

Building the Framing for a Recessed Shower Floor:
A Key Step in Our Big tiles curb-less heated shower floor with linear drain Bathroom Renovation


As our bathroom renovation project in East Abbotsford progressed, we reached a crucial stage: building the framing around the studs to create a recessed shower floor. This step was essential not only for accommodating the shower tray but also for ensuring a seamless transition between the main floor and the shower area. Here’s a detailed look at how we approached this part of the project.

Understanding the Importance of a Recessed Shower Floor

Creating a recessed floor for our curb-less shower offered several advantages. By lowering the shower area, we could reduce the transition height between the shower tray and the main floor, making it easier to step in and out. This design not only enhances the aesthetic appeal but also improves accessibility—an important consideration for our growing family.

Planning the Framing

Before we started building, we collaborated with Joey to design an effective framing system. Here’s how we approached the planning phase:

1. **Assessing the Existing Structure**:

We carefully examined the existing studs and the overall layout. This involved measuring the height of the shower tray and ensuring that our recessed area would align perfectly with the main floor.

2. **Determining the Dimensions**:

After deciding on the height and dimensions of the recessed shower area, we planned the framing to ensure the plywood floor would sit flush with the studs. This meant calculating the necessary width and depth of the framing.

Building the Framing

With our plan in place, it was time to roll up our sleeves and start building the framing. Here’s a step-by-step breakdown of the process:

1. **Gathering Materials and Tools**

We collected the materials needed for framing, including 2x4 lumber, plywood, a circular saw, a level, a drill, and screws. Having everything on hand streamlined the process and kept us focused.

2. **Cutting the Lumber**

Using our circular saw, we cut the 2x4s to the required lengths for the framing. This included vertical studs, top plates, and any additional supports needed for strength and stability.

3. **Constructing the Frame**

We began constructing the frame by securing the vertical studs to the existing studs in the wall. Using a level, we made sure each stud was perfectly vertical. Next, we attached the top plates to hold everything together. This provided a sturdy structure to support the plywood floor.

4. **Creating the Recess**

To create the recess for the shower tray, we carefully measured and cut out the plywood floor pieces. By ensuring that these pieces fit snugly between the framing, we could achieve a flush surface. The goal was to create a clean, level base for the shower tray, minimizing any height differences.

5. **Securing the Plywood**

Once the plywood pieces were cut, we secured them to the framing with screws, ensuring they were tight and flush with the top of the framing. This step was critical for creating a solid foundation that would support the weight of the shower tray and withstand daily use.

Finishing Touches

After securing the plywood, we inspected the framing to ensure everything was level and properly aligned. This attention to detail was vital, as it would set the stage for the installation of the shower tray and the subsequent tiling.

Reflecting on the Process

Building the framing for the recessed shower floor was a significant milestone in our renovation journey. It required careful planning and precise execution, but with the support of Joey and Jacqueline, we felt confident in our progress.

As we continue to work on our bathroom, we’re excited about the beautiful curb-less shower that’s taking shape. This experience has not only deepened our appreciation for thoughtful design but also brought us closer as a family as we tackled this project together.

Stay tuned for more updates as we move forward with the next steps in our renovation, including the installation of the shower tray and the beautiful tiles that will complete our East Abbotsford oasis!

Recessed floor substrate finished

Installation of linear drain and shower tray in this curb-less heated Big tiles shower floor open tub bathroom

planning shower tray and drain installation

Setting the Foundation: Installing Our Shower Tray and Linear Drain for our curb-less heated shower floor with open tub bathroom renovation


Setting the Foundation: Installing Our Shower Tray and Linear Drain

As we continued our curb-less heated shower floor with big tiles bathroom renovation journey in East Abbotsford, it was time for one of the most crucial steps: installing the shower tray and linear drain. This part of the process required careful attention to detail and the right materials to ensure a solid, long-lasting foundation. Here’s how we successfully glued down the shower tray using thin set and secured the linear drain with a strong bond.

Preparing for Installation

Before diving into the installation, we made sure that the shower area was clean, level, and free from any debris. This preparation was essential for ensuring a strong bond between the shower tray and the subfloor.

Materials We Used - **Thin Set Mortar**:

This high-quality adhesive was perfect for bonding the shower tray to the plywood base.

- **Cement Contact**: We used this to bond the drain pipe to the linear drain adaptor, ensuring a watertight seal. - **Weight Distribution Tools**: We had some heavy objects ready to apply even weight while the adhesive cured.

Gluing Down the Shower Tray

1. **Mixing the Thin Set**

Following the manufacturer's instructions, we mixed the thin set mortar to the right consistency. We aimed for a smooth, lump-free mixture that would spread easily without being too runny.

### 2. **Applying the Thin Set**

Using a notched trowel, we carefully applied an even layer of thin set on the plywood where the shower tray would sit. The notches helped create a good mechanical bond, allowing the tray to adhere securely.

### 3. **Positioning the Shower Tray**

With the thin set in place, we lifted the shower tray and positioned it carefully over the adhesive layer. It was crucial to ensure it was aligned properly and level. We pressed down firmly, allowing the thin set to make full contact with the tray.

### 4. **Applying Even Weight**

To enhance the bonding process, we placed some heavy objects on top of the shower tray. This added pressure helped ensure an even distribution of the adhesive and minimized the risk of any air pockets forming underneath. We let it sit for the recommended drying time, following the thin set’s instructions.

Curb-less heated shower floor linear drain install


## Securing the Linear Drain

With the shower tray set, it was time to install the linear drain. This step involved bonding the drain pipe to the linear drain adaptor using cement contact.

### 1. **Preparing the Drain Pipe and Adaptor**

We ensured both the drain pipe and the linear drain adaptor were clean and dry. Any debris or moisture could compromise the bond.

### 2. **Applying Cement Contact**

Following the instructions on the cement contact, we applied a thin layer to both the drain pipe and the adaptor. This adhesive is designed to create a strong, permanent bond, and we made sure to coat both surfaces evenly.

### 3. **Joining the Pipe and Adaptor**

We then carefully joined the drain pipe and the linear drain adaptor, twisting slightly to ensure a good fit. It was crucial to hold them in place for a few moments to allow the cement contact to start setting.

4. **Reinforcing the Bond**

Once joined, we continued to apply gentle pressure to ensure the bond was strong. This step was vital for preventing leaks in the future.

Conclusion

Installing the shower tray and linear drain was a rewarding process, marking another significant milestone in our bathroom renovation. Using thin set to glue down the tray and cement contact for the drain ensured that we were laying a strong foundation for the beautiful curb-less shower we envisioned. As we moved forward in our project, we felt a sense of accomplishment and excitement. We could already see how each step was bringing us closer to creating our dream bathroom in East Abbotsford. Stay tuned for more updates as we continue our journey, including the installation of beautiful tiles and fixtures that will complete our tranquil oasis!

Linear drain styrofoam bed thin set to floor
adaptor to drain pipe
Applying glue on the adaptor to drain pipe
Drain install
Install shower tray and apply weight to bond down

Ensuring a Watertight Seal:
Applying the Waterproofing Membrane in Our Curb-less heated shower floor with big tiles open tub Bathroom Renovation

Waterproofing the floor


As our curb-less heated shower floor with big tiles bathroom renovation in East Abbotsford progressed, we reached a critical stage: waterproofing the shower area. This step was essential to protect their home from moisture damage and ensure the longevity of our new curb-less shower. Here’s how we applied the waterproofing membrane with thin set and ensured a robust barrier against water infiltration.

The Importance of Waterproofing

Waterproofing is a crucial aspect of any bathroom renovation, especially in areas exposed to direct water flow like showers. A reliable waterproofing membrane helps prevent leaks, mold growth, and structural damage. By applying it correctly, we could create a secure environment for their shower tray and tiles.

Preparing for Waterproofing

Before we could start applying the waterproofing membrane, we made sure the shower area was clean, dry, and free from debris. Any imperfections or contaminants could compromise the bond of the membrane.

Materials We Used

- **Waterproofing Membrane**: We chose a high-quality skin waterproofing membrane designed for wet areas.

- **Thin Set Mortar**:

This was used as an adhesive to apply the membrane to the floor and walls.

- **Application Tools**: We had rollers, brushes, and a notched trowel ready for the job.

Applying the Waterproofing Membrane

1. **Mixing the Thin Set**

Following the manufacturer's guidelines, we mixed the thin set mortar to achieve a smooth, workable consistency. This would be the base for our waterproofing application.

### 2. **Applying the Membrane to the Floor**

Using a notched trowel, we spread the thin set evenly across the floor area where the shower tray was installed. This ensured that the waterproofing membrane would adhere properly to the surface.

3. **Rolling Out the Membrane**

With the thin set applied, we carefully rolled out the waterproofing membrane, ensuring it lay flat against the floor. We smoothed out any bubbles or wrinkles, which could compromise its effectiveness. The goal was to create a seamless layer of protection.

4. **Applying Thin Set Over the Membrane**

Once the membrane was in place, we used the notched trowel to apply another layer of thin set over it. This helped secure the membrane and prepare it for the wall application.

Overlapping the Walls for Complete Waterproofing

1. **Continuing the Membrane Up the Walls**

After securing the floor, it was time to extend the waterproofing membrane up the walls of the shower area. We measured and cut the membrane to the appropriate heights, ensuring that it overlapped the floor membrane to create a continuous barrier.

2. **Applying the Membrane on the Walls**

Using a trowel, we applied a generous layer of thin set to the walls. We then pressed the membrane into place, smoothing it down and ensuring complete contact with the adhesive. The overlap was crucial—this step ensured that any water that might escape would be directed back into the shower area, preventing leaks.

3. **Final Inspection**

Once the membrane was applied to the walls, we did a thorough inspection to ensure there were no gaps or areas where water could seep through. It was essential to double-check our work, as this would be a key factor in the long-term success of our waterproofing efforts.

Conclusion

Applying the waterproofing membrane was a significant milestone in our bathroom renovation journey. It required careful attention to detail, but we felt confident knowing we were taking the necessary steps to protect our home from water damage.

As we continue our renovation, we’re excited to see how this solid foundation will support the next phases of our project, including tiling and finishing touches. Stay tuned for more updates as we transform our bathroom into a beautiful, functional oasis in East Abbotsford!

Waterproofing the shower floor
water proofing on walls
waterproofing walls

Installing the Schluter ditra pads for electric cables under our big tile curb-less heated shower floor with open tub bathroom renovation

Installing Schluter Ditra Pads for Heated Flooring: A Warm Step Forward in Our Curb-Less Bathroom Renovation

Ditra pads installation for heating cables


Installing Schluter Ditra Pads for Heated Flooring:

A Warm Step Forward in Our Bathroom Renovation

As we progressed with our bathroom renovation in East Abbotsford, one of the most exciting upgrades we planned was installing heated flooring. This would add a touch of luxury and comfort, especially during the chilly months. To support this feature, we decided to use Schluter Ditra pads, which not only provide an excellent foundation for the heating cables but also offer moisture management and crack isolation. Here’s how we installed them.

## Understanding Schluter Ditra

Schluter Ditra is a polyethylene membrane designed for use under tile and stone. Its unique structure allows for effective moisture management and reduces the risk of cracks in the tile layer, making it ideal for our bathroom. Moreover, Ditra’s thickness is perfect for accommodating heating cables, ensuring even heat distribution.

## Preparing for Installation

Before diving into the installation process, we made sure the subfloor was clean, dry, and level. Any debris or imperfections could impact the effectiveness of the Ditra pads.

### Materials We Used

- **Schluter Ditra Pads**: We selected the appropriate amount based on our shower area and surrounding flooring.

- **Thin Set Mortar**: This would be used to adhere the Ditra pads to the subfloor.

- **Heating Cables**: The cables we chose were compatible with the Ditra system.

- **Application Tools**: We gathered a notched trowel, mixing bucket, and utility knife.

## Installing the Schluter Ditra Pads

### 1. **Mixing the Thin Set**

We began by mixing the thin set mortar according to the manufacturer's instructions. The right consistency is essential for proper adhesion; we aimed for a smooth, lump-free mixture.

### 2. **Applying the Thin Set to the Subfloor**

Using a notched trowel, we spread an even layer of thin set over the designated area of the subfloor. The notched edge helps create ridges that enhance the bond between the Ditra pads and the floor.

### 3. **Laying the Schluter Ditra Pads**

With the thin set in place, we carefully laid the Schluter Ditra pads onto the adhesive layer. We made sure to align the pads correctly, ensuring that the membrane’s anchoring fleece made full contact with the thin set.

### 4. **Pressing and Smoothing**

Once the pads were in place, we pressed down firmly to ensure good adhesion. We used a flat trowel to smooth out any bubbles or wrinkles, ensuring a tight bond between the Ditra pads and the thin set.

### 5. **Cutting the Ditra Pads**

For areas that required fitting around corners or obstacles, we used a utility knife to cut the Ditra pads to size. Precision was key to maintaining the integrity of the membrane and ensuring a seamless installation.

## Installing the Heating Cables

### 1. **Planning the Layout**

Before laying down the heating cables, we carefully planned their layout to ensure even coverage. We referred to the manufacturer’s guidelines for spacing and coverage to achieve the desired warmth.

### 2. **Securing the Heating Cables**

Starting from the power source, we gently laid the heating cables into the grooves of the Ditra pads. The grooves helped keep the cables in place while also providing optimal heat distribution across the surface. We secured them with tape as needed to prevent movement during the next steps.

### 3. **Testing the Cables**

Once the cables were laid out, we performed a quick test to ensure everything was working correctly. It was vital to confirm that there were no breaks or shorts in the system before covering them up.

### 4. **Final Layer of Thin Set**

With the cables in place, we applied another layer of thin set over the Ditra pads to encapsulate the heating cables. This created a solid foundation for our tile installation while ensuring the cables would be protected.

## Conclusion

Installing Schluter Ditra pads and heating cables marked an exciting phase in our bathroom renovation. Not only did we enhance the comfort of our space, but we also ensured a durable, long-lasting foundation for our tiles.

As we move forward, we’re thrilled to see how the heating system will transform our bathroom experience, making it a cozy retreat during the cold months. Stay tuned for more updates as we continue to bring our dream bathroom to life in beautiful East Abbotsford!

Electric cables filled


# Passing Through Schluter Cables:

Ensuring a Seamless Installation with Thermostat Probes and Ohm Testing

As we continued to elevate our curb-less heated shower floor with open tub bathroom renovation in East Abbotsford, we reached a crucial phase: passing through the Schluter heating cables, including the thermostat probes, and ensuring everything was functioning perfectly. This step required meticulous attention to detail to guarantee optimal performance of our heated flooring system. Here’s a detailed look at how we approached this essential part of the process.

## Understanding the System

The Schluter heating system consists of electric heating cables designed to provide warmth and comfort underfoot. The thermostat probes play a key role in regulating the temperature of the cables, ensuring that the floor remains at a consistent and comfortable level. Before we covered everything with thin set, we wanted to ensure that the system was properly installed and functioning correctly.

## Preparing for Installation

Before we began passing through the cables and probes, we made sure that our Schluter Ditra pads were securely in place, providing a solid foundation for the heating system. We had all the necessary materials ready, including the heating cables, thermostat probes, thin set mortar, and testing equipment.

### Materials We Used

- **Schluter Heating Cables**: Designed for use with the Ditra system.

- **Thermostat Probes**: To monitor the floor temperature.

- **Ohm Meter**: For testing the integrity of the heating cables.

- **Thin Set Mortar**: To secure everything in place.

- **Utility Knife**: For any adjustments needed.

## Passing Through the Schluter Cables

### 1. **Planning the Layout**

We began by carefully planning the layout of the heating cables and thermostat probes. It was essential to refer to the manufacturer’s guidelines for proper spacing and placement to ensure even heat distribution across the floor.

### 2. **Securing the Thermostat Probes**

We first positioned the thermostat probes in their designated locations. These probes were placed in the areas where we wanted to measure the temperature most accurately, typically in the center of the heated zones. We used clips to secure the probes to the Ditra pads, ensuring they stayed in place as we worked.

### 3. **Laying the Heating Cables**

With the probes secured, we proceeded to lay out the heating cables according to our planned layout. The cables were carefully placed into the grooves of the Ditra pads, which helped keep them in position. As we worked, we took care to avoid overlapping the cables, as this could cause uneven heating or damage to the system.

## Performing the Ohm Test

### 1. **Testing Before Covering**

Once the cables and probes were in place, we conducted an ohm test using our ohm meter. This test was critical to ensure that the heating cables were intact and functioning properly before we covered them with thin set.

### 2. **Recording the Readings**

We carefully measured the resistance of the heating cables and compared the readings to the manufacturer’s specifications. This step was vital for confirming that there were no breaks or shorts in the cables. If the readings were within the expected range, we could confidently move forward.

## Filling the Schluter Ditra Pads and Cables with Thin Set

### 1. **Mixing the Thin Set**

After confirming that everything was functioning correctly, we mixed the thin set mortar according to the manufacturer’s instructions. Achieving the right consistency was essential for ensuring a solid bond.

### 2. **Applying the Thin Set**

Using a notched trowel, we spread a layer of thin set over the Schluter Ditra pads and heating cables. It was important to apply an even coat to encapsulate the cables fully and ensure they were protected. We worked methodically to cover all areas, taking care to avoid any air pockets.

### 3. **Smoothing the Surface**

Once the thin set was applied, we used the trowel to smooth the surface, ensuring an even layer. This step was crucial for creating a solid foundation for the tile installation that would follow.

## Conducting a Final Ohm Test

Before moving on to the tiling phase, we decided to conduct a final ohm test. This was an important step to ensure that no damage had occurred to the cables during the application of the thin set. We measured the resistance again and confirmed that the readings remained within the expected range.

## Conclusion

Passing through the Schluter cables and thermostat probes, performing ohm tests, and filling everything with thin set marked a significant milestone in our bathroom renovation. With the heating system securely in place, we were one step closer to creating a warm and inviting oasis in our home.

As we look ahead to the tiling phase, we’re excited to see how the heated flooring will enhance our bathroom experience. Stay tuned for more updates as we continue to bring our vision to life in beautiful East Abbotsford!

Creating a Natural Look: Organizing Our Porcelain Tile Patterns for our curb-less heated shower floor with big tiles bathroom renovation

Open boxes of tile and spread them to find out patterns


# Creating a Natural Look: Organizing Our Porcelain Tile Patterns

As we delved deeper into our bathroom renovation in East Abbotsford, it was time to tackle one of the most visually impactful elements of the project: our porcelain tiles. We had carefully selected a range of tiles to create a genuine, natural look that would enhance the beauty of our new space. The next step was to open all the tile boxes and spread them out to assess the variety of patterns. Here’s how we approached this important stage of the project.

## The Importance of Tile Pattern Variation

Selecting the right tiles was a labor of love. We wanted our bathroom to exude warmth and authenticity, reminiscent of natural stone or wood. To achieve this effect, it was crucial to have a variety of patterns that could be seamlessly blended together. This would help avoid a monotonous look and create a dynamic visual experience.

## Unboxing the Tiles

### 1. **Gathering Our Supplies**

Before we started, we ensured we had a clear workspace. We gathered all the tile boxes and prepared some open floor space where we could lay them out without clutter. Having a clean area made it easier to visualize our design.

### 2. **Opening the Boxes**

With everything in place, we began unboxing the tiles, one by one. As we lifted each tile out, we admired the unique variations in color, texture, and pattern. It was exciting to see how each piece contributed to the overall aesthetic we were aiming for.

### 3. **Spreading the Tiles**

After unboxing, we arranged the tiles around our workspace. We laid them out in groups based on their patterns, creating distinct sections for each type. This visual display allowed us to see how the different tiles interacted with one another.

## Analyzing the Patterns

### 1. **Identifying Unique Features**

As we examined each tile, we took note of the unique features that stood out. Some tiles had beautiful veining, while others showcased rich, earthy tones. We also paid attention to the sizes and shapes of the tiles, ensuring we had a good mix that would add depth to the installation.

### 2. **Planning the Layout**

With the tiles spread out before us, we began to envision how they would look once installed. We considered how to distribute the different patterns throughout the space to create a cohesive yet varied look. By mixing the tiles strategically, we could achieve a layout that felt natural and organic.

### 3. **Testing Combinations**

To further refine our vision, we began testing different combinations. We placed tiles next to each other to see how they complemented or contrasted with one another. This trial-and-error process was invaluable in helping us make final decisions about the layout.

## Making Final Selections

### 1. **Creating a Balanced Design**

After hours of experimenting, we felt confident about the arrangement we had developed. We aimed for a balanced design that felt harmonious, with an even distribution of patterns throughout the space. Our goal was to evoke the feeling of walking on natural stone, enhancing the overall ambiance of our bathroom.

### 2. **Documenting Our Plan**

Once we finalized our layout, we documented our plan with notes and sketches. This would serve as a helpful reference during the installation process, ensuring we stayed on track and achieved the look we envisioned.

## Conclusion

Opening up all the porcelain tile boxes and spreading them around was a pivotal moment in our bathroom renovation journey. It allowed us to appreciate the beauty and uniqueness of each tile while carefully planning how to achieve a genuine natural look.

As we prepare for the next steps in our project, we’re excited about how the tiles will transform our space. Stay tuned for more updates as we continue to bring our vision to life in beautiful East Abbotsford!

Planning the Perfect Glass Door Partition: A Seamless Transition in Our Large format tile shower floor with linear drain Bathroom Renovation

Transition grout line to have the glass door installed on and against


# Planning the Perfect Glass Door Partition: A Seamless Transition in Our Bathroom Renovation

As we progressed with our bathroom renovation in East Abbotsford, we faced the exciting challenge of installing a glass door partition. This not only served as a stylish feature but also played a crucial role in the transition from the sloped shower area to the main floor. Here’s how we meticulously planned for this important element of our design, ensuring a flawless finish that would be both functional and visually appealing.

## The Importance of a Glass Door Partition

The glass door partition was a key design choice in our bathroom renovation. It would create an open feel while providing a barrier to keep water contained within the shower area. Additionally, it facilitated a smooth transition from the sloped floor of the shower to the level height of the main bathroom floor.

## Planning the Transition

### 1. **Understanding the Slope and Drain**

To achieve an effective water drainage system, we needed to ensure that the slope of the shower floor met the drain perfectly. The slope had to guide water directly to the linear drain, preventing any pooling or leakage outside the shower area. This involved careful measurement and planning.

### 2. **Situating the Grout Line**

One of the key considerations was where to place the grout line at the transition point. We decided that the grout line would act as a visual and functional separator between the shower area and the main floor. It would also allow for a clean finish, providing a clear delineation of space while enhancing the overall aesthetic.

### 3. **Achieving a Flush Finish**

We aimed for a seamless transition where the slope of the shower floor met the transition. This meant that the end of the sloped area needed to be flush with the grout line, ensuring that water flowed freely into the drain without any obstructions. Achieving this flush finish required precision and skill.

## Bringing in the Experts

Given the complexity of this task, we knew we needed the expertise of a professional to ensure the installation was executed flawlessly. Here’s how we worked with the expert to bring our vision to life:

### 1. **Consultation and Design Review**

We scheduled a consultation with a seasoned professional who had experience with glass partitions and bathroom renovations. During this meeting, we reviewed our design plans, discussed our vision, and highlighted the importance of the transition between the sloped shower and the main floor.

### 2. **Detailed Measurements**

The expert took precise measurements of the space to ensure that the glass partition would fit perfectly. This included measuring the height, width, and angle of the slope to determine how the partition would integrate with the overall layout.

### 3. **Planning the Installation**

With the measurements in hand, the professional helped us plan the installation process. We discussed the materials needed, including the type of glass, hardware for the door, and the best methods for securing the partition in place.

### 4. **Execution**

Once everything was planned, the expert began the installation. This involved:

- **Preparing the Area**:

Ensuring that the slope was finished and the transition point was clean and ready for the grout line.

- **Installing the Glass Partition**:

Carefully securing the glass door to ensure stability and a perfect seal.

- **Finishing Touches**:

Applying grout at the transition line and ensuring that the slope met the drain flush, creating a seamless water management system.

## Conclusion

Planning for the glass door partition in our bathroom renovation was a meticulous process that required careful thought and expertise. By situating a grout line at the transition and ensuring the slope met the drain perfectly, we were able to create a functional and aesthetically pleasing space.

As we move forward with our renovation, we’re excited to see how this beautiful partition will enhance our bathroom, providing both style and practicality. Stay tuned for more updates as we continue to transform our space into a stunning oasis in East Abbotsford!

Time to Set the Tiles: Achieving Perfect Sloping and Evenness with Thin Set and Mud Bed Mix

Tile installation on a mud bed


# Time to Set the Tiles:

Achieving Perfect Sloping and Evenness with Thin Set and Mud Bed Mix

With our bathroom renovation in East Abbotsford nearing the finish line, we reached an exciting milestone: setting the tiles! This step was crucial, as it would define the look and functionality of our space. To ensure that our tiles were laid perfectly, we decided to use a combination of thin set and a mud bed mix. Here’s how we approached this important phase of our project.

## Preparing for Tile Installation

### 1. **Gathering Materials**

Before diving into the installation, we made sure to gather all necessary materials and tools:

- **Porcelain Tiles**:

Our carefully selected tiles, ready to be installed.

- **Thin Set Mortar**:

This would be used to adhere the tiles to the mud bed.

- **Mud Bed Mix**:

A combination of sand and cement that would serve as our base layer, providing the required slope and evenness.

- **Trowels**:

For spreading the thin set and mud mix.

- **Level**:

To ensure everything was even.

- **Tile Spacers**:

To maintain consistent gaps between tiles.

### 2. **Preparing the Mud Bed**

Creating a mud bed is essential for achieving the perfect slope in a shower area. Here’s how we prepared it:

- **Mixing the Mud Bed**:

Following the manufacturer’s instructions, we mixed the mud bed mix to a workable consistency. It should be moist but not overly wet, allowing it to hold its shape.

- **Forming the Slope**:

We carefully applied the mud mix to the shower floor, starting from the walls and working our way to the drain. Our goal was to create a slope that directed water towards the drain, preventing any pooling. Using a straightedge and level, we meticulously checked the slope to ensure it was even.

### 3. **Setting the Mud Bed**

Once we were satisfied with the slope, we allowed the mud bed to cure for the recommended time. This step was vital for creating a strong and stable base for the tiles.

## Setting the Tiles

### 1. **Applying Thin Set**

With the mud bed cured and ready, we mixed the thin set mortar according to the instructions. Using a notched trowel, we spread an even layer of thin set over the mud bed where the first tile would be placed.

### 2. **Laying the Tiles**

Starting from the center of the room, we began laying the tiles. Here’s how we did it:

- **Positioning the First Tile**: We carefully pressed the first tile into the thin set, making sure it was level and aligned with our design plan.

- **Using Tile Spacers**:

As we continued to lay tiles, we inserted tile spacers between each one. This helped maintain consistent gaps for grout and ensured that everything was perfectly aligned.

### 3. **Checking for Levelness**

After laying a few tiles, we paused to check the level. Using a long level, we confirmed that the tiles were sitting evenly, without any lippage (height differences between adjacent tiles). If any adjustments were needed, we gently lifted the tiles and added more thin set as necessary.

### 4. **Continuing the Process**

We continued this process, laying tiles one by one while ensuring that each was securely set into the thin set. It was essential to keep a consistent slope towards the drain, so we regularly checked our progress.

### 5. **Final Touches**

Once all the tiles were laid, we stepped back to admire the work. We allowed the thin set to cure according to the manufacturer’s instructions before proceeding to the next steps of grouting and sealing.

## Conclusion

Setting the tiles with thin set and a mud bed mix was a pivotal moment in our bathroom renovation. By carefully creating the perfect slope and ensuring evenness, we set the stage for a beautiful and functional space.

As we move forward, we can’t wait to see the final results, complete with grouting and finishing touches that will bring our vision to life. Stay tuned for more updates as we transform our East Abbotsford bathroom into a stunning oasis!

Big tiles installed on a bed of mortar
Big tiles on a mud bed shower floor

Elevating Our Space: Installing Large Porcelain Wall Tiles with a Bamboo Panel Look

big porcelain wall tile


# Elevating Our Space:

Installing Large Porcelain Wall Tiles with a Bamboo Panel Look

With the floor tiles beautifully set and the mud bed complete, it was finally time to turn our attention to the walls of our bathroom in East Abbotsford. We had chosen large porcelain tiles designed to mimic the serene look of bamboo panels, bringing a touch of nature indoors. This was an exciting step in our renovation journey, and we were eager to see how these tiles would transform the space. Here’s how we approached this installation.

## The Beauty of Bamboo Look Tiles

Bamboo is renowned for its natural beauty and calming aesthetic, making it a perfect choice for a bathroom setting. The large porcelain tiles we selected not only offered the aesthetic appeal of bamboo but also provided the durability and water resistance that are essential in a bathroom environment.

## Preparing for Installation

### 1. **Gathering Materials and Tools**

Before we began, we made sure to have all the necessary materials on hand:

- **Large Porcelain Tiles**:

Our bamboo-look tiles, ready to be installed.

- **Thin Set Mortar**:

Designed for use with porcelain tiles.

- **Tile Spacers**: To ensure consistent grout lines.

- **Trowels**:

A notched trowel for spreading thin set and a flat trowel for adjustments.

- **Level**:

For checking tile alignment. - **Measuring Tape**:

For precise measurements. - **Wet Saw**:

For cutting tiles as needed.

### 2. **Planning the Layout**

Before starting the installation, we laid out the tiles on the floor to visualize the final design. This step allowed us to identify any necessary cuts and ensure a balanced distribution of the bamboo patterns.

- **Starting Point**:

We decided to start from the center of the wall to create a symmetrical look. This approach would help us maintain an even pattern as we worked our way to the edges.

## Installing the Wall Tiles

### 1. **Applying Thin Set**

We mixed the thin set mortar according to the manufacturer’s instructions, achieving a smooth, workable consistency. Using a notched trowel, we applied a layer of thin set to a section of the wall, starting from our chosen center point.

### 2. **Laying the Tiles**

With the thin set in place, we pressed the first tile onto the wall:

- **Positioning**:

We ensured that the tile was level and aligned with our layout. Large tiles can be tricky, so we took extra care to maintain even spacing.

- **Using Tile Spacers**:

As we continued, we inserted tile spacers between each tile to maintain consistent grout lines. This was essential for achieving a professional-looking finish.

### 3. **Checking for Levelness**

As we installed each tile, we frequently checked our progress with a level. It was crucial to ensure that the tiles were perfectly aligned and flat against the wall. If any adjustments were needed, we carefully lifted the tiles and added more thin set as necessary.

### 4. **Cutting Tiles for Edges**

When we reached the edges and corners, we used a wet saw to cut the tiles to the appropriate size. This step required precision to ensure a clean and professional appearance. We made sure to measure carefully and wear safety goggles while cutting.

### 5. **Continuing the Process**

We continued this process, working our way up the wall. The beauty of the large porcelain tiles began to shine through, and we could envision how the finished space would look.

## Final Touches

Once all the tiles were installed, we stepped back to admire the transformation. The bamboo look added a warm, inviting feel to our bathroom, enhancing the natural aesthetic we were aiming for.

## Conclusion

Installing the large porcelain wall tiles that mimic bamboo panels was a significant milestone in our bathroom renovation. The combination of durability and beauty made this choice perfect for our space, and we couldn’t be happier with the results.

As we move forward with the finishing touches, including grouting and sealing, we’re excited to see how the entire project comes together. Stay tuned for more updates as we continue to transform our East Abbotsford bathroom into a stunning oasis!

Wall tile complete
Big tiles curb-less heated shower floor before grout
Big tiles curb-less heated shower floor bathroom
Bamboo lookalike porcelain tile
Photo from front door of one open curb-less large format tile shower floor with linear drain
Low capture to show floor's perfection open  curb-less shower floor with linear drain
Video of shower here
Schluter linear drain video
Schluter electric cables video
Schluter how to recess your shower floor